Leaky Building
Stage 1:
Cladding removed, Rab board installed prior to cavity system.
Stage 2:
Aluminum cladding installed and hand rails up.
Stage 3:
View from entrance across deck out to sea.
Stage 4:
Ultra durable design at front to deal with high risk enviroment.
Stage 5:
Traditional design at street frontage.
Stage 6:
Engineered tiles on support jacks to create level entry from living area.
