Executive house
Stage 1:
Existing house to decayed to renovate, demolished and sire cleared.
Stage 2:
Concrete slab poured and back of site stabilized with retaining walls.
Stage 3:
Roof framed up and ready for cladding.
Stage 4:
Roof on, wrap on and windows installed.
Stage 5:
Cladding on and deck hand rails installed.
Stage 6:
Front door entrance over curved bridge driveway.